1. Our Quotation & How We Work
We begin with a free visit at a convenient time to measure up, discuss your requirements, and understand your budget and desired finish.

Following our visit, we aim to email your quote within two working days. Our quotation will outline the scope of works and the costs involved.

Unless stated otherwise, our quote includes:
labour
installation materials and parts required to complete the works
removal and disposal of waste at a licensed facility

Anything not included will be clearly marked within the quotation.

2. Supply & Installation / Installation Only
Supply & Fit
Where we provide a supply & fit service, it is normal for us to recommend sanitaryware and taps we feel are suitable for your requirements. In most cases, clients prefer to choose and supply their own tiles, although we are happy to advise.

Installation Only
For installation only quotations (where the customer supplies sanitaryware/taps etc.), we will clearly list what must be supplied at the bottom of the quote, which acts as a purchase checklist of required items.

Installation pricing assumes standard fitting requirements. If customer-supplied products later provided are non-standard, additional charges may apply due to the additional time and complexity involved.

Examples of non-standard items include (but are not limited to):
wall mounted taps
mosaic / metro / subway tiles
natural stone tiles
small format tiles
chevron or herringbone patterns
tile-over shower bases
toilets requiring electrical mains connection (e.g. some smart toilets)

3. Materials & Workmanship Standards
All installation materials and parts required for the quoted work are included in the costing.

We take quality seriously and “over-engineer” installations to ensure long-term durability and watertightness. For example:
fully supporting baths and showers on timber frames
triple sealing bath/shower wall connections

These methods can increase material costs compared to some competitors, however the difference is we do the job correctly and provide a workmanship guarantee.

4. Product Supply by the Customer
If the client is supplying products (including tiles, sanitaryware, taps and accessories), all items must be on site and available on the first day of installation.

This is essential because different products require different pipework positioning and fixing points, and we need the correct products available to carry out first-fix plumbing accurately and professionally.

We commonly recommend products for sanitaryware that are from our chosen suppliers. We are happy to install items supplied from other suppliers, however installation costs may increase if products are non-standard or require additional labour.

5. Pre-Work Survey
Most bathroom renovations are straightforward. However, in some cases we may need to carry out a more in-depth survey prior to commencement of work to ensure the installation goes smoothly.

This may include access to:
loft space
electrical installations
under-floor areas

There is no additional charge for this survey.

6. Non-Standard Tiles
Non-standard tiling is more labour intensive and may incur additional costs.

Non-standard tiles include:
natural stone tiles
ceramic/porcelain tiles with a side less than 20cm
mosaic tiles
metro/subway tiles
intricate patterns such as chevron or herringbone

Where non-standard tiles/patterns are chosen, a surcharge may apply.

7. Unforeseen / Additional Work
Although uncommon, hidden issues can sometimes be discovered once works begin. These issues cannot always be identified during the initial quote stage.

Examples include:
damaged or unsafe electrical circuits (e.g. missing/damaged CPC/earth)
rotten flooring
damaged wall structure
hidden leaks or pipework defects

Where unforeseen work is required to make safe or complete the installation properly, this will be:
explained clearly to the customer
agreed before completion where possible
added to the final invoice as “additional works”

8. Protection of the Property & Cleanliness
We take care to keep your home as clean and protected as possible.

Each day, we will:
protect flooring and the access route to the bathroom with mats/sheets
roll up and clear protection at the end of each working day where possible

We also require an area of approximately 4sqm for preparing/storing fittings and materials.

Any damage caused directly by our scheduled works will be repaired/made good by us.

9. Waste Removal
All old bathroom fittings, rubble and renovation waste will be removed and disposed of at a licensed disposal facility, and the cost of this is included in the quotation.

10. Timescales & Use of Bathroom
Most bathroom and shower room renovations are completed within 5–10 working days, depending on the scope of works.

Following the survey, we can provide a more accurate estimated duration.

We aim to reduce disruption wherever possible:
If a bath is being installed, it can often be installed early (typically day two), allowing bathing facilities to remain available.
If the toilet being replaced is the only toilet in the house, we will ensure the new toilet is usable at the end of each working day (even if not fully fixed in until later).

11. Working Hours
We typically aim to start at 7.30 am each working day, the day length can vary and often depends on the tasks that day, this can be advised in more detail at the start of works.

Some installations require longer days to keep projects efficient and minimise overall disruption. We appreciate your patience, as this approach often allows us to complete installs sooner.

If your property has noise restrictions or specific time requirements, please let us know in advance and we will do our best to accommodate.

12. Deposits, Cancellations & Rescheduling
Upon acceptance of the quote, a deposit is required to secure the booking date.

Where we are supplying products, the deposit will be higher and form part of the overall payment.

If the work is cancelled after acceptance:
deposits are non-refundable, as they may cover time reserved and/or materials ordered.

If works are postponed and rescheduled:
the deposit will carry over and remain part of the overall payment.

13. Payments & Stage Payment System
To support smooth running of the business and fair progress payments, we operate a stage payment system.

This protects both parties and avoids large payments in advance without visible progress.

Typical stage payments are:
Deposit upon acceptance to book the works
First payment on the first day works begin
Second payment during tiling stage
Balance payable on completion/handover day.
If there is decorating quoted this will be a separate final payment.

Stage payments must be made on time. We reserve the right to pause works if stage payments are more than one day late.

14. Non-Payment
In the unlikely event of non-payment, we reserve the right to enforce our policy to recover supplied bathroom parts/materials and to pursue outstanding balances.

15. Guarantee
We guarantee our workmanship for two (2) years, subject to:
the bathroom/shower room being correctly looked after
seals being maintained properly
normal use conditions

Product guarantees:
Products supplied by us are guaranteed in accordance with manufacturer warranties.
If products are not supplied by us, we are not responsible for faults or manufacturer defects. In this case the supplier/manufacturer should be contacted directly. Any correction works in this case may be chargeable work.

16. Maintenance & Exclusions
Bathrooms require basic maintenance.

The following are not covered under our workmanship guarantee:
blocked shower traps caused by hair build-up (customers should clean traps regularly)
limescale-related staining or grout discolouration

If we attend for a “blocked shower” and determine the blockage is caused by hair build-up, a charge will apply.

Discoloured grout is commonly caused by limescale. We recommend regular descaling/cleaning to preserve the finish. Grout discolouration due to limescale is not covered under our guarantee.